Over the years, ShelvMaster has worked in countless Government Departments, Chain Department Stores, Major Construction Companies all the way down to a small spare parts shop who just needed a second has rolling filing system.

Below is a small collection of projects ShelvMaster have undertaken over the years.
Once the floor has been marked and straight lined by laser, studs are fixed into the floor to support the track ready for leveling. A professional dumpy level is used to find the highest point of the floor. This is where leveling of the track commences. The track is rough set onto the studs and then rechecked for levels.
Once the floor has been marked and straight lined by laser, studs are fixed into the floor to support the track ready for leveling. A professional dumpy level is used to find the highest point of the floor. This is where leveling of the track commences. The track is rough set onto the studs and then rechecked for levels.
The track is set to height taking into account the levels of the rest of the floor area. Specialist "Top Nuts", are wound down into the track using a custom tool. Leveling the track sideways is an extremely important part of this process. A bottom retaining nut is wound up to set the track into place, levels are again checked with the dumpy to ensure accuracy. This process is repeated for every stud holding the track.
The track is set to height taking into account the levels of the rest of the floor area. Specialist "Top Nuts", are wound down into the track using a custom tool. Leveling the track sideways is an extremely important part of this process. A bottom retaining nut is wound up to set the track into place, levels are again checked with the dumpy to ensure accuracy. This process is repeated for every stud holding the track.
ShelvMaster was contracted to install new tracks for an old rolling filing system that was being installed by in house movers.

The pictures below give a simple rundown of how a track is laid and leveled. Variances for track level are allowed to be 1mm per meter, ShelvMaster works within a variance of no more that ¼mm per metre.

Once the track is level and tight, a non shrink grout is tightly packed underneath the track to spread and support the weight of the rolling filing system.
This project, being a part of the Australian Federal Government means high security clearance and remaining silent on details, therefore the only information is some cleared pictures and basic details.

Over 1000 bays of static shelving at 3.6 meters high, this was a fast track project as the client needed to fill completed bays as soon as available. Working around each other was made simple by good communication between ShelvMaster and the client.
A brand new warehouse made for an easy, clean, clutter free start to the project. At 3.6 metres tall, having all the right equipment for working at height made light of some of the work. This picture shows the layout of each run of bays. It was essential that all rows were aligned correctly to allow for specialist machine access between the rows.
A brand new warehouse made for an easy, clean, clutter free start to the project. At 3.6 metres tall, having all the right equipment for working at height made light of some of the work. This picture shows the layout of each run of bays. It was essential that all rows were aligned correctly to allow for specialist machine access between the rows.
The warehouse being so large, it was divided into 2 levels. Both levels were filled with static shelving. A small section of otherwise un-useable space was filled with a High Security 'B' Class rolling filing system. Final inspection by the client. Everything signed off and finished sooner than expected.
The warehouse being so large, it was divided into 2 levels. Both levels were filled with static shelving. A small section of otherwise un-useable space was filled with a High Security 'B' Class rolling filing system. Final inspection by the client. Everything signed off and finished sooner than expected.
Installing a track system rolling filing system while the area is still a construction site poses some logistical problems. Taping the area off not only keeps the area clean but is also a safety factor because of the trip hazards present. Each section of track must be aligned perfectly so as to avoid the "Clunk" effect when the large steel wheels roll over the join. This picture shows one of the rolling filing systems near completion but still surrounded by a construction zone. Carefully taped off, the unit came through without so much as a scratch.
Installing a track system rolling filing system while the area is still a construction site poses some logistical problems. Taping the area off not only keeps the area clean but is also a safety factor because of the trip hazards present. Each section of track must be aligned perfectly so as to avoid the "Clunk" effect when the large steel wheels roll over the join. This picture shows one of the rolling filing systems near completion but still surrounded by a construction zone. Carefully taped off, the unit came through without so much as a scratch.
Before each bay is tightened completely, a centre shelf is put in place to ensure each bay is spread to the optimal distance so as the shelves are not to tight nor loose. Mechanical Assists Mechanisems are attached and checked for alignment and ease of use. This is just one of the several rolling filing systems installed. Pearl White finish with the contrasting Gloss Black mechanical assist consuls
Before each bay is tightened completely, a centre shelf is put in place to ensure each bay is spread to the optimal distance so as the shelves are not to tight nor loose. Mechanical Assists Mechanisems are attached and checked for alignment and ease of use. This is just one of the several rolling filing systems installed. Pearl White finish with the contrasting Gloss Black mechanical assist consuls
Each row is precisely spaced for for lift access. Enough room is left nearer the walss for full unobstructed access to all aisles. The mezanine level you see on the left of this picture houses a small office area and static shelving for filing. As opposed to leaving open bays for pallett storage, steel mesh flooring is ready to be installed onto the beams to store hand pick items.
Each row is precisely spaced for for lift access. Enough room is left nearer the walss for full unobstructed access to all aisles. The mezanine level you see on the left of this picture houses a small office area and static shelving for filing. As opposed to leaving open bays for pallett storage, steel mesh flooring is ready to be installed onto the beams to store hand pick items.
Before the pallet racking was secured to the ground, a trial run of the forklift was conducted by the client. Of couse the trial was a success. Top and bottom beams are inserted to ensure the bays are sqaured correctly before leveling and securing to the ground. One by one, each upright foot, front and rear is precisely leveled and secured to the ground.
Before the pallet racking was secured to the ground, a trial run of the forklift was conducted by the client. Of couse the trial was a success. Top and bottom beams are inserted to ensure the bays are sqaured correctly before leveling and securing to the ground. One by one, each upright foot, front and rear is precisely leveled and secured to the ground.
The Australian National University was ranked 27th top university in the world in 2013. An achievement to be especially proud of considering the vast number of universities throughout the world.

ShelvMaster was proud to be a part of the new Research School of Biology, Michael BIRT wing construction.

Time, and space was tight, but with careful planning, co-ordination between the head contractor and ShelvMaster, the task of installing several Rolling Filing Units, Specialised racking shelves and a cantilever support system was completed well within time.
ActewAGL Canberra is an essential energy supplier. For smooth and functional operation of one of Canberra's largest organisations, it is essential that their warehousing is laid out in a way that helps organisation of and effecient selection of materials.

ShelvMaster spent some of the coldest and windiest winter days in an open warehouse helping put together all the storage and stacking requirements for ActewAGL.
 
 
 
 
 
TOP
TOP
TOP
TOP
TOP
projects undertaken by ShelvMaster Pty Limited, ABN 19 243 919 136. Mobile on the Optus Network 0413 624 762
dinkumbusiness.com.au - website creation - quick reach marketing
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
 
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
TOP
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
St Mark's vision is to be a scholarly Christian theological community. In pursuing this goal, St Mark's strives to provide a program of high quality university–based theological education, postgraduate studies and research to people throughout Australia and overseas.
St Mark's vision is to be a scholarly Christian theological community.

ShelvMaster's vision was to complete their new library compactus to the highest standard, in a timely and unobtrusive way.

Mission accomplished, happy client, happy library users.
Nice suprise at the start. Live electrical cables protruding from the floor. Qualified sparkies to the rescue. With the floor completed, and the books behind us dust free and safe, time to start building. Tos ensure complete safety of the shelving on top of the mobile units, extra bracing is installed.
Nice suprise at the start. Live electrical cables protruding from the floor. Qualified sparkies to the rescue. With the floor completed, and the books behind us dust free and safe, time to start building. Tos ensure complete safety of the shelving on top of the mobile units, extra bracing is installed.
Not saying a word about this picture, except that it did grow back. Not much room to move. Even less when the library was still open and fully functioning. The final mechanical assist wheel wind consul is installed.
Not saying a word about this picture, except that it did grow back. Not much room to move. Even less when the library was still open and fully functioning. The final mechanical assist wheel wind consul is installed.